How to operate:
1. Before use, add 3-5% curing agent, stir evenly and wait for use
Wet weather can be added appropriately.
2..The surface treatment agent should be uniform and in place, and pay attention to keeping the brush clean and soft. Only after the treatment agent is dried can it be glued.
3. The glue must be uniform and consistent in thickness to avoid lack of glue or piled up glue. The glue can only be applied for the second time after the glue is dried.
4. After the adhesive film is dried, strive to align and close it once during the adhesive film viscosity maintenance time, and select the appropriate pressurization pressure and pressurization time according to the shoe shape.
5. Process flow:
The first glue on the assembly line direction -55℃~65℃ (3min-5min) on the treatment agent 60℃~70℃ (3min-6min) on the first glue on the first glue -60℃~70℃ (3min-6min) on the second glue on the second glue - patching pressure.
If necessary, polish the shoe material before glueing it